Elkins Launching Two Infrastructure Projects Monday

Elkins, W. Va., January 28, 2021: On Monday, City of Elkins contractors will kick off two major infrastructure projects. Bear Contracting will begin Phase II of the city’s sewer/stormwater separation project, and Newman Plumbing will begin replacing remote-read water meters for all city water utility customers.

The sewer/stormwater separation project is the second phase of sewer-system improvements Elkins is required to implement under a 2011 consent decree with the U.S. Environmental Protection Agency. The goal of this project is to reduce the number of combined sewer/stormwater pipes in Elkins, so that sudden downpours are less likely to overwhelm the sewer system’s capacity and cause overflows of untreated sewage to the Tygart Valley River.

In the phase of the sewer/stormwater project commencing Monday, crews will eventually excavate sections of 15 city streets and alleys in the neighborhood west of Wimer Field to install new, dedicated stormwater lines and related infrastructure components, such as manholes and catch basins.

The first street that will be excavated is Railroad Avenue, starting where it dead ends against the south bank of the Tygart Valley River, near Kelly Foundry.

This project, which is funded by a $4.9 million bond issue, will not result in any additional increase in sewer rates. More information about this project, including a list and map of the affected streets, can be found here: www.bit.ly/Phase2Sewer.

The water-meter project will replace the remote-read meters currently in use by the city’s approximately 4,200 water customers. These water meters are five years past warranty coverage, and about 1,300 have already failed. The opportunity to replace these water meters arose when aggressive costsaving measures during the 2016 water plant construction project spared the necessary $1.5 million. As a result, this project will not result in any increase in water rates. More information about this project can be found here: www.bit.ly/ElkinsWaterMeters

The impact of the water-meter replacement project, which must be completed by September, is projected by the contractor to be minor for most customers, involving only about 15 minutes’ disruption of water service per meter. The impacts of the sewer/stormwater separation project will vary by street but can be expected to include changes to traffic and parking patterns and the presence of heavy equipment; this project is not projected to disrupt any customer’s sewer service, however.

To stay current on information about these and other projects, as well as city news and safety alerts, please follow City of Elkins on one or more of the following communication channels:

##

Water Repairs

UPDATE: Water Outage Tuesday in West Elkins EXTENDED

2/22: Water Outage Extended February 22nd, 2022 | 5:49 pm Water outage announced here will continue through the evening due to difficulties encountered underground. Outage area now includes Tygart Valley Mall because a second line needed to be secured. ========================= On Tuesday, […]

Read More
Water Repairs

Update: Boil Water Notice near Industrial Park LIFTED

Update as of 1/29, 7:45 a.m.: This Boil Water Notice has been lifted. Lab testing found no contamination in the sample. ====================== As a result of loss of pressure on a water main during repair of a leak, a Boil Water Notice […]

Read More
Water Repairs

Prepare for Water Outage: South Elkins and Wilson Hill

City of Elkins is responding to a break in a 12-inch transmission line near Builder’s Supply. When we shut off water to this line, customers throughout South Elkins, including Jennings Randolph Elementary School, and customers in a large section of Second Ward, […]

Read More
Boil Water Notices, Water Department, Water Repairs

Why So Many Water Outages?

There is clearly an unacceptable number of ongoing water outages and sometimes resulting Boil Water Notices. What is going on? One major reason is that many underground water lines in Elkins are past their end-of-life and need to be replaced. The reason […]

Read More
Announcements, Water Repairs

Water Outage Monday Night in D&E Area

City of Elkins Water System employees will be replacing fire hydrants on the campus of Davis & Elkins College on Monday night, starting at 8 p.m. The fire hydrants being replaced are near Halliehurst and Gribble Hall. Water will be off or […]

Read More
Announcements, Sewer/Stormwater Project, Water Repairs

RESCHEDULED: 9/2 South Elkins Water Outage

On Thursday (9/2), starting at 4 p.m., water will be off for customers in the area outlined in red on the belowmap and bounded by: Livingston Avenue 12th St./railroad tracks South Gate/South Davis Ave. Scott Ford Road The outage also includes Jennings […]

Read More
Subscribe To Our Newsletter

Subscribe To Our Newsletter

Stay up to date with the latest news and alerts by signing up for our newsletter!

You have Successfully Subscribed!